Things have ramped up. Electrical and gas work finished and passed inspection. Hooray!
Drywall installed in two day. Attic insulation blown in (R60 - we are toasty now). The forecast is for a bit of snow this weekend, but we don't care. Our ears are pleased with the silence of not having the furnace running non-stop.
Next week, the mudders and tapers will arrive to prepare the walls and ceiling for paint. The painter was here yesterday to look over the project and give us a quote. The stucco guy was also here to gather what he needs to quote on doing something with the exterior.
We remain hopeful that a dumpster is delivered soon because the backyard is a mess with all the scrap drywall pieces and other bits of construction material.
Saturday, March 31, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment