All the drywall is up and the bulk of the mudding and taping is done. The crew is set to come back Tuesday to do the final sanding (we are preparing for the dust). We have the painter lined up for later in the week to do the priming, followed by the final touch-ups on the drywall. Once the drywall is done we can get the electricians back to install the lights.
Later next week, the storage room will be ready so we can move much of the furniture piled high in the basement and get back to some semblance of order.
The dumpster arrived shortly after the last post and the backyard is clean and tidy.
Not much to show in the way of pictures, other than drywall in the rooms. I'll post some pictures once everything has been primed.
Sunday, April 08, 2007